Location:
Commercialization Milestone: Anepower Powers China’s First 100MW-Scale Supercapacitor-Lithium Hybrid BESS Project

Commercialization Milestone: Anepower Powers China’s First 100MW-Scale Supercapacitor-Lithium Hybrid BESS Project

2025-12-06 11:18 Anepower

Project Overview

The Shunde Yunshun Energy Storage Project in Guangdong, China, has officially entered commercial operation. As China's first 100MW-level supercapacitor-lithium battery hybrid energy storage commercial demonstration project, it establishes an industry benchmark for utility-scale hybrid BESS deployment.

The project deploys next-generation 1.25MW and 1.75MW Grid-Forming Power Conversion Systems (PCS) at scale. Replicating the external operating characteristics of synchronous generators, these grid-forming converters deliver generational technical advantages over traditional grid-following units. Equipped with inertial response, damping control, high/low voltage ride-through (H/LVRT), and continuous fault ride-through capabilities, the PCS actively responds to grid voltage and frequency regulation demands while providing excellent adaptability to weak grids, establishing a robust hardware foundation for stable project operation.





I. Project Overview: Industry-First Hybrid Energy Storage Benchmark

Invested by the Guangdong National Energy Storage Innovation Center, the project features a complete energy storage technology and equipment portfolio provided by CSG Technology. The station boasts a total installed capacity of 200MW, comprising a 150MW lithium iron phosphate (LFP) BESS and a 50MW supercapacitor storage system.

The core conversion equipment—the 1750kW and 1250kW Grid-Forming PCS units—were co-developed by CSG Technology and Anepower, and manufactured by Anepower. These units are individually optimized for the supercapacitor and lithium-ion subsystems to support comprehensive grid services.

II. Technical Advantages: Complementary Storage Technologies for Diverse Grid Needs

The project innovatively integrates two distinct energy storage technologies to achieve functional synergy: supercapacitors deliver millisecond-level response for transient grid power regulation, while lithium-ion batteries provide long-duration energy support for large-capacity peak shaving.

The platform supports a full range of core grid services, including grid-forming support, primary and secondary frequency regulation, black start, and reserve capacity support. Backed by AI-driven data analytics, the project serves to establish scalable, standardized operating specifications for hybrid energy storage systems.

III. Core Products: Purpose-Built Grid-Forming PCS Platform

1750kW Grid-Forming PCS (Supercapacitor Subsystem): Engineered specifically for the high-power, rapid charge/discharge behavior and wide voltage fluctuations of supercapacitors. Utilizing dedicated control algorithms and derating strategies, it precisely matches capacitor operating conditions, delivering millisecond-level response for high-power transient events and short-term frequency and voltage regulation.

1250kW Grid-Forming PCS (Lithium-Ion Subsystem): Features 20ms ±100% rapid charge/discharge power switching, along with integrated low- and high-voltage ride-through (LVRT/HVRT) and anti-islanding protections. Engineered for complex operating environments such as weak grids and black-start scenarios, ensuring long-term operational stability for the lithium-ion battery system.

IV. Project Value: Supporting Utility-Scale Hybrid BESS Commercialization

The Yunshun Energy Storage Project establishes a 100MW-level hybrid validation platform, effectively evaluating the operational dynamics, control strategies, and dispatch mechanisms of combined lithium–supercapacitor systems. The integrated turnkey solution offers high versatility, making it widely applicable to shared energy storage platforms above 100MW and across core application scenarios, including peak shaving and frequency regulation.